Technical data
Project description
VE 10:
- Overground West Extensive dismantling and new construction of track systems and points
- Construction of two new flyover structures and a double-track steel tied arch bridge
- Construction of a new noise barrier bridge and additional noise barriers
- New construction of retaining structures and the environmental connection tube in Laim
- Complete renovation of the Laim passenger railway station
- Electrical work on low-voltage and medium-voltage systems, underground cable construction work
VE 30:
Main station tunnel Construction of the approx. 40 m deep access structure using the cover construction method with diaphragm wall enclosure
Platform tubes in mining construction method under compressed air in the track area of the main railway station
New construction of the ramp structure using the cut-and-cover method
Driving two S-Bahn tubes with an external diameter of around 8.50 m from Donnersberger Brücke to Marienhof station using two hydro-shield machines in single-shell segmental construction method
Four inner-city rescue shafts with connecting structures
Extensive special civil engineering and dewatering measures
Construction method
- Mining construction method
- Civil engineering
- Construction under rolling wheels
Geology
- Silty sand, silt and clay
General data
Project
2nd S-Bahn main line Munich
Client
DB NETZE, DB Netz AG, DB Station & Service AG, DB Energie GmbH
Contractor
ARGE Tunnel Hauptbahnhof ARGE Oberirdisch West Wayss & Freytag Ingenieurbau AG, Ed. Züblin AG, Max Bögl Group, BAUER Spezialtiefbau GmbH
Construction period
2019 to 2027
Net construction sum
Total project € 865 million
Photos: DB Netze
Further projects
Brisbane
The largest infrastructure project in Australian history

Frankfurt am Main
13,000 journeys shifted from car to rail every day

Wewelsfleth
Wind energy from northern to southern Germany