Die Brücke, die bisher Fehmarn mit dem Festland verbindet.

Fehmarn, Germany

Fehmarn Sound Crossing (FSQ) – VP3 Immersed Tunnel

Technical Specifications

Project description

Construction of a modern, approximately 1.8-kilometre-long immersed and sinking tunnel to serve as a new central link between the island of Fehmarn and the German mainland. The sinking tunnel is connected on both sides to further tunnel sections, which are being constructed using the cut-and-cover method. The tunnel comprises four tunnel tubes – two each for road and rail – containing four lanes for road traffic and two tracks for rail. The entire structure will be approximately 2.2 kilometres long.

Rail partnership model: The project is being carried out in seven contract packages and in collaboration with numerous other construction companies under an alliance model.
 

Construction method

We are responsible for Contract Package 3, the immersed tunnel:

  • On the mainland, to the west of the causeway leading to the Fehmarn Sound Bridge, a dry dock is being built for the fabrication of the 12 tunnel segments
  • At the same time, the portal area on the island is being built using the cut-and-cover method
  • Three elements can be produced simultaneously in the dry dock
  • Once completed, the dock will be flooded and the three segments will be towed into the Fehmarn Sound and temporarily stored on the water
  • Whilst the next three sections are being built in the dry dock, the completed sections will be lowered into the strait one after the other and connected to the tunnel portal on the island side
  • Once all 12 tunnel sections have been joined, the dry dock will be converted into the tunnel portal on the mainland
  • Road traffic across the Fehmarn Sound Bridge will continue throughout the entire construction period
Geology

The existing ground consists largely of tarraston, a particularly challenging construction ground due to its pronounced swelling behaviour. The construction of the dry dock therefore requires the highest level of technical expertise and experience from all those involved.

General information

Project

Fehmarn Sound Crossing (FSQ) – Package 3: Immersed Tunnel

Client

DB InfraGO and DEGES (Deutsche Einheit Fernstraßenplanungs- und -bau GmbH)

Contractor

Rail partnership model in an alliance with 15 other companies

  • Use

    Infrastructure

  • Type

    Road and rail tunnels

  • Length

    2.2 kilometres

  • Type of construction

    Immersed tunnel
    Cut-and-cover method

Rail link for the Fehmarn Belt Fixed Link

The existing road and railway bridge over the Fehmarn Sound – which has been in operation since 1963 and is just under one kilometre long – currently forms the main link between the island of Fehmarn and the German mainland. However, studies have shown that, in the long term, the structure will no longer be able to cope with future increases in traffic volumes.

Consequently, a comprehensive study of alternative options concluded that the bridge should be replaced by a modern, approximately 1.7-kilometre-long floating and submerged tunnel. This new tunnel will accommodate four lanes for road traffic and two railway tracks, thereby significantly increasing the capacity of the link.

The Fehmarn Sound Crossing is part of the major European project ‘Rail Connection to the Fixed Fehmarn Belt Crossing’ and will in future provide a fast and environmentally friendly link between Hamburg and Copenhagen in just 2.5 hours.

The project is being implemented as an IPA project under the ‘Rail Partnership’ model, with a multi-party contract that ensures the full integration of all key project partners throughout the planning and construction phases. 
Management is based on jointly agreed target costs and a comprehensive incentive scheme that distributes opportunities and risks among the partners throughout the entire course of the project. 

Further projects

Privacy Settings
This site uses cookies and third party elements to provide you with certain features and an optimal website experience. These include cookies that are strictly necessary for the operation of the site, cookies for anonymous statistical analysis/measurement, and the embedding of external services whose use you must consent to prior to use. You can find more information below in the notes on the individual functions and in detail in our privacy policy.
These cookies are necessary to enable the basic functions of our website.
This consent allows you to view external contents (via iframe).
This consent allows you to view embedded maps.
This consent allows you to watch embedded videos.
Page views are recorded for anonymous statistical purposes using Google Analytics/Matomo in order to constantly optimise our website. The visitor's IP address is anonymised.
Marketing cookies from Google/Meta are used to display personalised advertising. This is done by tracking visitors across websites.
Settings saved