Technical data
Project description
Wayss & Freytag Ingenieurbau AG, together with ZECH BAU SE Rohbau, was commissioned to carry out the extended shell construction for the PANDION OFFICEHOME Beat 3.0 office project in Munich's Werksviertel district. A seven-storey office building with a staggered storey is being built on a gross floor area of around 33,000 m². With a construction period of around 13 months, we are making a contribution to urban development in the east of Munich together with our consortium partner. The project fulfils high ecological standards and is aiming for DGNB Gold certification, among other things.
Extended shell with a gross volume of approx. 167,000 m³, seven storeys plus staggered storey
Combined use of reinforced concrete in-situ and element construction
Industrial look with clinker brick plinth, metal façade and skygarden
The execution also includes the following services:
- Laying of underground pipes and foundation earth electrodes
- Installation of a fresh concrete composite film
- Filling and plastering work
- Internal insulation of the basement floors and underground car park
- Mastic asphalt work and underground car park paving
- Concrete coating
- Laying empty conduits for later installations
Construction method
- Solid reinforced concrete construction
Geology
- Excavation pit partly with backfill and natural soil
General data
Project
PANDION OFFICEHOME Beat 3.0
Client
PANDION Group
Contractor
Wayss & Freytag Ingenieurbau AG in consortium together with ZECH Bau SE Rohbau Munich
Construction period
March 2025 to 2027
Net construction sum
21 million €
Further projects
München
Shell construction with a basement and four storeys

Baumholder
Refurbishment of seven residential buildings

Baumholder
New construction of a total of 70 residential units