Technical data
Project description
- Gross floor area: approx. 5,500 m²
- Building length: around 114 metres
- Vehicle parking spaces: 13
- Additional facilities:
- 4 flats
- workshops
- fitness room
- Training room
- Breathing apparatus training area
Construction method
- Concrete construction (frame formwork)
General data
Project
New construction of the Garching fire station
Client
City of Garching
Contractor
Wayss & Freytag Ingenieurbau Ag
Construction period
2023 to 2026, shell construction (W&F service): September 2023 to December 2024
Net construction sum
Total project >€30 million
New FireWatch for new challenges
The long-serving fire station was no longer adequate in many respects, as Garching is growing and the demands on the fire brigade and its infrastructure are also increasing.
Technical developments, diverse tasks in the area of hazard prevention and assistance as well as hundreds of operations per year, with an upward trend, increasingly demand more capacity. In addition, two federal motorways, a main road, a state road, a large industrial estate and a modern research campus increase the number of potential sources of danger. The exit situation at the old fire station was particularly critical, posing an additional safety risk. The new fire station should meet all modern requirements.
Further projects
München
Shell construction with a basement and four storeys

Baumholder
Refurbishment of seven residential buildings

Baumholder
New construction of a total of 70 residential units