Due to swelling events and the associated heave and damage to the tunnel inner lining, it was planned to install protective netting in the area of the tunnel roof and the upper side walls.
6 km railway tunnel from Stuttgart central railway station to Bad Cannstatt as part of the large-scale project „Stuttgart 21“.
1 two-lane road tunnel and 1 bridge, total tunnel length 100 m, length of the total section to be built by us under the contract: approx. 520 m
Foot and cycle path tunnel, length 114.77 m, max. clear width 6.45 m, clear height approx. 4.22 m.
single-track railway tunnel with a widened section allowing the railway line to be split into 2 tracks, 14 trough blocks, 13 tunnel blocks, total length 353 m.
A completely new hospital with six floors: 21,000 square meters for 285 beds and seven operating theatres.
The construction of a new three-storey hospital using the reinforced concrete skeleton construction method will score with regard to energy efficiency, since the modern, optimized and functional hospital consumes significantly less energy.