The construction of a new three-storey hospital using the reinforced concrete skeleton construction method will score with regard to energy efficiency, since the modern, optimized and functional hospital consumes significantly less energy.
Building: in solid construction, reinforced concrete skeleton construction
Length: approx. 140 m
Maximum width: approx. 112 m
3-storey flat base construction
of which two wings 39 x 68 m as 3 additional upper floors
Total floor area: approx. 48,000 m ²
Gross building volume: approx. 195,000 m³
Ceilings
285 beds and seven operating theatres
Client SLK-Kliniken Heilbronn GmbH
Contract value approx. € 11 Mio. netto
Construction period May 2012 - April 2013