Technical specifications

Scope of works:

  • 1 two-lane road tunnel and 1 bridge
  • total tunnel length 100 m 
  • length of the total section to be built by us under the contract: approx. 520 m

Construction method

  • Cut and cover method 
  • Crossing of the A 3 motorway in 10 construction phases without interrupting the traffic flow
  • Crossing of an existing tunnel on the Cologne-Frankfurt high-speed railway line

Geology

  • alternating sequences of sand and gravel

General data

Project
LSG Betriebsweg Gateway Gardens

Client
Grundstücksgesellschaft Gateway Gardens

Contractor
Wayss & Freytag Ingenieurbau AG

Construction time
01/2019-12/2023

Construction sum net
€  14 million

 

Utilisation
Infrastructure
Type
Road tunnel to give LSG caterers access to the Frankfurt Airport apron
Length
100 m
Construction Method
cut and cover method
Related Projects

Related Projects

Georgsberg Tunnel,
Georgsberg Tunnel,
Germany

Foot and cycle path tunnel, length 114.77 m, max. clear width 6.45 m, clear height approx. 4.22 m.

Read more
Tunnel Vötting
Tunnel Vötting
Germany

95 m preliminary cut, preliminary cut approx. 35,000 m³ 30 m north portal structure 462 m tunnel constructed by the mining method: Top heading and bench/invert heading in Tertiary hilly terrain

Read more
Bad Cannstatt Tunnel
Bad Cannstatt Tunnel
Germany

6 km railway tunnel from Stuttgart central railway station to Bad Cannstatt as part of the large-scale project „Stuttgart 21“.

Read more