Related Projects
![Neu-Isenburg Junction,](/fileadmin/user_upload/projekte/tunnelbau/konventioneller-tunnelbau/Regionaltangente-West/1E9A9749_preview.jpg)
single-track railway tunnel with a widened section allowing the railway line to be split into 2 tracks, 14 trough blocks, 13 tunnel blocks, total length 353 m.
![Bad Cannstatt Tunnel](/fileadmin/user_upload/ATC_preview.jpg)
6 km railway tunnel from Stuttgart central railway station to Bad Cannstatt as part of the large-scale project „Stuttgart 21“.
![LSG Tunnel at Frankfurt Airport](/fileadmin/user_upload/projekte/tunnelbau/konventioneller-tunnelbau/LSG_Tunnel/LSG_Tunnel_1_preview.jpg)
1 two-lane road tunnel and 1 bridge, total tunnel length 100 m, length of the total section to be built by us under the contract: approx. 520 m