2 parallel tunnel tubes with a length of 1.645 km each, inner diameter 10,15 m; 6 cross passages driven under the protection of ground freezing; 2 access ramps, which at the same time function as start and target shafts, Passing under A4/A133 motorways incl. connection to existing infrastructure
1 four-lane motorway tunnel, total tunnel length 1,100 m, length of total section on our behalf approx. 4,800m.