Scope of works:
Construction method
Project
Fehmarnbelt Tunnel
Client
Femern A/S
Contractor
Femern Link Contractors (FLC) with partners VINCI Construction Grands Projets, Per Aarsleff, Royal BAM Group, Wayss & Freytag Ingenieurbau AG, Solétanche-Bachy International, CFE and Max Bögl Stiftung & Co.
Construction period
2021 to 2029
Images: Femern A/S
Length: approx. 7,400 m 2 drives: West 3,230 m and East 3,8700 m in length Internal diameter: 3.60 m External diameter: 4,50 m bore diameter approx. 4.80 m
Due to swelling events and the associated heave and damage to the tunnel inner lining, it was planned to install protective netting in the area of the tunnel roof and the upper side walls.