Technical specifications

Scope of works:

  • 1 four-lane motorway tunnel,
  • total tunnel length 1,100 m,
  • length of total section on our behalf approx. 4,800m

Construction method

  • 6 floating sinking elements with a total length of 720m
  • excavation pits for the open construction method up to 30m deep

Geology

  • Weser sands and Lauenburg strata

General data

Project
Weser crossing, motorway tunnel under the river Weser

Client
DEGES

Contractor
Wayss & Freytag Ingenieurbau AG, North and Central sections

Construction period
08/2023 - 08/2028

Net construction costs
€ 650 million

 

Utilisation
Infrastructure
Type
Motorway tunnel, four lanes
Length
1,100 m
Construction Method
immersed tunnel

Images: DEGES

Related Projects

Related Projects

Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Germany

A new sewerage canal through the southwest of Munich relieves the existing canal system.

Read more
Storage sewer Mauerpark  Berlin
Storage sewer Mauerpark Berlin
Germany

Storage sewer at Berlin's Mauerpark will prevent sewer overflow into the Spree and Pranke rivers in the future.

Read more
Rotterdamsebaan
Rotterdamsebaan
Netherlands

2 parallel tunnel tubes with a length of 1.645 km each, inner diameter 10,15 m; 6 cross passages driven under the protection of ground freezing; 2 access ramps, which at the same time function as start and target shafts, Passing under A4/A133 motorways incl. connection to existing infrastructure

Read more