Start widescreen image

Search

206 results:
21. Conventional Tunnelling  
Conventional Tunnelling The construction of tunnels using conventional construction methods has always been a challenge to every engineer. Here, the engineer’s most important task is the evaluation…  
22. Cut and Cover  
Cut-and-Cover Tunnels Tunnels, retained cuts and top-down excavations - special kinds of traffic structure. Wherever geology and inner city traffic conditions permit, cut-and-cover tunnels,…  
23. Tunnelling Technologies  
Tunnelling Technologies “Tunnel Technologies” as part of the Tunnelling Departmentof Wayss & Freytag Ingenieurbau AG, headquartered in Frankfurt, provides customized equipment solutions…  
24. Tunnel Refurbishment  
Tunnel refurbishment Tunnels are important traffic and civil engineering structures with high safety standards and demanding technical equipment. Often the failure to meet these safety standards…  
25. Special foundation  
Specialist foundation engineering The Central Division carries out demanding specialist foundation engineering works in difficult soil conditions throughout Europe. The following construction works…  
26. In-situ Concrete Diaphragm Walls  
In-situ Concrete Diaphragm Walls In-situ concrete diaphragm walls are mostly used as watertight and deformation-resistant sheeting elements for deep construction pits. Furthermore, they can be used…  
27. Bored piles  
Bored piles Bored piles are one of the most common deep foundation elements. They serve to transfer loads from structural loads into load-bearing soils. Bored piles are used as cylindrical…  
28. Jet Grouting Method  
Jet Grouting Method When using the get grouting method, the soil structure is dissolved by means of a high-energy cutting jet (water or cement suspension, in some cases coated with compressed air)…  
29. Micropiles and anchors  
Micropiles The term “micropile” covers piles with a diameter of up to 300 mm. Quite often single rods or rod groups and also small reinforcement cages are used as bearing elements. The bearing…  
30. Light railway, Karlsruhe  
Client: Arge Stadtbahntunnel Employer: KASIG Contract value: 615.000 € Construction period: January 2014 - May 2014 For the construction pit at „Durlacher Tor“ Station, below the cover 275…  
Search results 21 until 30 of 206