Skip to content
Latest news

Düsseldorf: The U81 gets underway

The new U81 light rail line, a key transport artery, was officially opened in Düsseldorf on 4 September 2026. The Minister-President of North Rhine-Westphalia, Hendrik Wüst, Dr Stephan Keller, Lord Mayor of the state capital Düsseldorf, State Secretary Dr Claudia Elif Stutz and Oliver Krischer, Minister for the Environment, Nature Conservation and Transport of the State of North Rhine-Westphalia, jointly commissioned the first section of the U81 light rail line.

The new light rail line connects Düsseldorf Airport with the city centre and the Düsseldorf Exhibition Centre. Wayss & Freytag Ingenieurbau, Mitte division, constructed the new transport link in a joint venture with its partners Implenia Civil Engineering and MCE. At the heart of the light rail line are the Nordstern Bridge – an arched steel bridge built using the incremental launching method whilst traffic continued to flow – and a 400-metre-long underground tunnel constructed using the cut-and-cover method.

The new light rail line significantly improves access to the airport terminal by public transport and creates new direct connections. This benefits travellers and employees alike, as well as commuters and visitors to trade fairs and events.

The U81 connects the airport terminal directly to the Merkur Spiel-Arena/Messe Nord stop for all major international trade fairs. The journey time between the airport terminal and Merkur Spiel-Arena/Messe Nord is just under seven minutes. The U80 also runs on this route every 20 minutes between Düsseldorf Central Station and the airport terminal, taking around 18 minutes to complete the journey.

The Nordstern Bridge on the U81 has been honoured three times in recent years by renowned expert juries. These awards, recognising the bridge from different perspectives, confirm the outstanding quality of the Nordstern Bridge as an innovative engineering structure and a defining feature of the new U81 link to the airport.

Treasurer Dorothée Schneider pays tribute to the close collaboration between all those involved: “This structure is not just about concrete, steel and technology. Behind this structure are people. People who planned, calculated, tested, built, co-ordinated and, time and again, found solutions. Our thanks go to all of them today.”

 

Copyright photos: City of Düsseldorf/Communications Department, Wayss & Freytag Ingenieurbau AG

Das Projektteam.
W&F; Executive Board member Thomas Paetzold, Division Manager Thomas Fiedler and Division Manager Jenni Moritz congratulated our Düsseldorf team on their success in delivering this exciting construction project.
Blick auf die Brücke mit Bahnschienen.
Vertreter schneiden das Eröffnungband durch.
Ribbon-cutting ceremony to mark the opening of the new U80/U81 light rail link, attended by Dr Claudia Elif Stutz, State Secretary at the Federal Ministry of Transport; Lord Mayor Dr Stephan Keller; Hendrik Wüst, Minister-President of North Rhine-Westphalia; and Annette Grabbe, Member of the Executive Board of Rheinbahn (from left).Copyright:City of Düsseldorf/Communications Department
Blick auf den Bahnsteig.
Das Projektteam.
W&F; Executive Board member Thomas Paetzold, Division Manager Thomas Fiedler and Division Manager Jenni Moritz congratulated our Düsseldorf team on their success in delivering this exciting construction project.
Blick auf die Brücke mit Bahnschienen.
Vertreter schneiden das Eröffnungband durch.
Ribbon-cutting ceremony to mark the opening of the new U80/U81 light rail link, attended by Dr Claudia Elif Stutz, State Secretary at the Federal Ministry of Transport; Lord Mayor Dr Stephan Keller; Hendrik Wüst, Minister-President of North Rhine-Westphalia; and Annette Grabbe, Member of the Executive Board of Rheinbahn (from left).Copyright:City of Düsseldorf/Communications Department
Blick auf den Bahnsteig.
Privacy Settings
This site uses cookies and third party elements to provide you with certain features and an optimal website experience. These include cookies that are strictly necessary for the operation of the site, cookies for anonymous statistical analysis/measurement, and the embedding of external services whose use you must consent to prior to use. You can find more information below in the notes on the individual functions and in detail in our privacy policy.
These cookies are necessary to enable the basic functions of our website.
This consent allows you to view external contents (via iframe).
This consent allows you to view embedded maps.
This consent allows you to watch embedded videos.
Page views are recorded for anonymous statistical purposes using Google Analytics/Matomo in order to constantly optimise our website. The visitor's IP address is anonymised.
Marketing cookies from Google/Meta are used to display personalised advertising. This is done by tracking visitors across websites.
Settings saved