Technical specifications

Project description

  • 962 m long double-track railway tunnel
  • 440,000 m³ excavated material with tunnel lining (shotcrete and netting)
  • geophysical and direct soil investigation of the karst-prone rock
  • material processing and backfilling
  • rain retention and reservoir
  • construction of a new parking and toilet facility at "Albhöhe"

Construction method

Cut and cover construction method in arch cross-section

Geology

lower massive limestone

General data

Project

NBS (new construction) Stuttgart-Augsburg Section Wendlingen-Ulm
PFA (section) 2.3 Albhöhe; VE 230-1 Widderstall Tunnel 

Client

DB Projekt Stuttgart-Ulm GmbH

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period

2013 to 2016

Construction costs

approx. € 43.7 million
Utilisation
Infrastructure
Type
Railway tunnel, double-track
Length
962 m
Construction Method
Cut and Cover construction method in arch cross-section
Related Projects

Related Projects

Europagarten Tunnel
Europagarten Tunnel
Germany

60.000 m² coherent park area for approximately 40.000 inhabitants – a street tunnel makes it possible.

Read more
Gateway Gardens
Gateway Gardens
Germany

Fast and sustainable traffic connection in Rhein Main: Light railway connection Gateway Gardens

Read more
Luise-Kiesselbach-Platz
Luise-Kiesselbach-Platz
Germany

The 2,800 m long, inner-city tunnel using both bored pile-cover construction method and open construction method relieves a central traffic junction in Munich.

Read more