Technical specifications

Scope of work

  • Combined flood relief and road tunnel
  • Length: 5,230 m
  • Internal diameter: 11.83 m

Construction method

 

  • TBM tunnelling using a Mixshield (slurry shield)
    shield diameter: 13.21 m
  • Segmental lining

Geology

 

  • Sand
  • Gravel
  • Limestone

General data

Project
Stormwater Management and Road Tunnel (SMART) Project,
flood relief and road tunnel in the city centre of Kuala Lumpur

Client
MMC Eng. Group Bhd./Gamuda Eng. Sdn. Joint Venture,
Kuala Lumpur, Malaysia

Contractor
Wayss & Freytag Ingenieurbau AG

Construction period
January 2003 to January 2006

Construction costs
€ 83 million

Utilisation
Infrastructure
Type
Flood relief- and Road tunnel
Length
5,230 m
Construction Method
TBM tunneling using a Mixshield (slurry shield)
Related Projects
Storage sewer Mauerpark  Berlin
Storage sewer Mauerpark Berlin
Germany

Storage sewer at Berlin's Mauerpark will prevent sewer overflow into the Spree and Pranke rivers in the future.

Read more
Uetliberg Tunnel
Uetliberg Tunnel
Switzerland

Greatly varying geology required different driving methods during the construction of the Uetliberg Tunnel in Switzerland. The 4.4 km long road tunnel connects the Birmensdorf bypass with the existing national road Zurich-Chur.

Read more
Weinberg Tunnel, Lots 3.1 and 3.2
Weinberg Tunnel, Lots 3.1 and 3.2
Switzerland

The Zurich main station - Altstetten - Oerlikon cross-city line forms the central part of the West- East-axis of the Swiss railway lines. The Weinberg tunnel is the centrepiece of the cross-city line and connects the new through station “Löwenstraße” in Zurich with Oerlikon station.

Read more