Technical specifications

Scope of work

  • 2 parallel railway tunnels
  • length: 5.3 km each
  • internal diameter: 7.15 m
  • 7 cross-passages
  • 1 ventilation shaft

Construction method

  • TBM tunnelling using 2 EPB shields
  • shield diameter: 8.15 m
  • steel fibre reinforced segmental lining
  • both tunnels driven simultaneously from a retained cut structure

Geology

  • Sand
  • London Clay
  • Silt
  • Gravel

General data

Project
Channel Tunnel Rail Link
Contract C250
single-track railway tunnel

Client
Union Railways (North) Ltd.,
London, UK

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
February 2001 to September 2004

Construction costs
€ 217 m

Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
2 * 5.3 km
Construction Method
TBM tunneling using a EPB shield
Related Projects
New Coal-Fired Power Plant in Wilhelmshaven
New Coal-Fired Power Plant in Wilhelmshaven
Germany

High quality and in time: four cooling water pipelines in pipe jacking drive for a new coal-fired power plant in Wilhelmshaven.

Read more
Rotterdamsebaan
Rotterdamsebaan
Netherlands

2 parallel tunnel tubes with a length of 1.645 km each, inner diameter 10,15 m; 6 cross passages driven under the protection of ground freezing; 2 access ramps, which at the same time function as start and target shafts, Passing under A4/A133 motorways incl. connection to existing infrastructure

Read more
Limmern Access Tunnel I
Limmern Access Tunnel I
Switzerland

1,700 m above sea level: In the Linthal Project 2015 the inclined tunnel with an incline of 24 % compensates an altitude difference of 900 m in the high mountains of Switzerland.

Read more