Technical specifications

Scope of work

  • 2 parallel railway tunnels
  • length: 5.3 km each
  • internal diameter: 7.15 m
  • 7 cross-passages
  • 1 ventilation shaft

Construction method

  • TBM tunnelling using 2 EPB shields
  • shield diameter: 8.15 m
  • steel fibre reinforced segmental lining
  • both tunnels driven simultaneously from a retained cut structure

Geology

  • Sand
  • London Clay
  • Silt
  • Gravel

General data

Project

Channel Tunnel Rail Link
Contract C250
single-track railway tunnel


Client

Union Railways (North) Ltd.,
London, UK

Contractor

Wayss & Freytag Ingenieurbau AG
in a joint venture


Construction period

February 2001 to September 2004


Construction costs

€ 217 m
Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
2 * 5.3 km
Construction Method
TBM tunneling using a EPB shield
Related Projects

Related Projects

Weinberg Tunnel, Lots 3.1 and 3.2
Weinberg Tunnel, Lots 3.1 and 3.2
Switzerland

The Zurich main station - Altstetten - Oerlikon cross-city line forms the central part of the West- East-axis of the Swiss railway lines. The Weinberg tunnel is the centrepiece of the cross-city line and connects the new through station “Löwenstraße” in Zurich with Oerlikon station.

Read more
Limmern Access Tunnel I
Limmern Access Tunnel I
Switzerland

1,700 m above sea level: In the Linthal Project 2015 the inclined tunnel with an incline of 24 % compensates an altitude difference of 900 m in the high mountains of Switzerland.

Read more
Diabolo Project
Diabolo Project
Belgium

Railway tunnel provides a modern connection of Zaventem airport close to Brussels to the European high-speed railway system and to E 19 motorway.

Read more