Technical specifications

Lot 1: Driving of access tunnel

  • L approx. 80 m and start cavern
  • V approx. 1,000 m³
  • Construction of 2 pressure partitions(walls)
  • Extension of access tunnel incl. tunnel portal
  • Infrastructure provisions

Construction method

  • Drill and blast
  • SCL inner lining

Geology

  • Mainly dolomite

Lot 2: driving of target shaft

  • D = 7 m
  • T approx. 40 m
  • Target cavern L approx. 15 m

Construction method 

  • Drill and blast
  • SCL inner lining

Geology

  • Mainly dolomite

Lot 3: TBM driven seepage water tunnel

  • D = 3.0 m
  • L approx. 160 m

Construction method

  • Pipe jacking with reinforced concrete pipes
  • L = 2.8 m
  • Installation of two soft gel seals respectively in the transition area between rock and dam fill

General data

Project
Sylvenstein Dam BA (construction lot) 3
construction of a new seepage water tunnel
Lots 1-3

Client
Wasserwirtschaftsamt (water authority) Weilheim for the Free State of Bavaria

Contractor
Wayss & Freytag Ingenieurbau AG

Construction period
March 2013 to July 2014

Construction costs
approx. € 5.6 million

 

 

Utilisation
Water/Sewerage
Type
Seepage water tunnel
Length
160 m
Construction Method
Pipe Jacking
Related Projects
Storage channel Sint-Pieters Woluwe
Storage channel Sint-Pieters Woluwe
Belgium

New storage channel in Brussels East stores up to 8,000 m³ of rainwater and provides relief during heavy rainfall.

Read more
Corrib Pipeline Tunnel
Corrib Pipeline Tunnel
Ireland

Tunnel for a gas pipeline under Scruwaddacon Bay, Ireland was awarded the prize for best environmental initiative 2015 during the Tunnelling Awards at the International Tunelling Association.

Read more
Mine Water Drainage Tunnel, Ibbenbüren
Mine Water Drainage Tunnel, Ibbenbüren
Germany

Length: approx. 7,400 m 2 drives: West 3,230 m and East 3,8700 m in length Internal diameter: 3.60 m External diameter: 4,50 m bore diameter approx. 4.80 m

Read more