Technical specifications

Scope of work

  • 4 cooling water pipelines DN 3400
    with a length of 300 m each
  • 1 fish return pipeline DN 1200
    with a length of 300 m
  • start shaft: 30 m x 25 m x 15 m
    diaphragm walls with anchored underwater concrete slab
  • target shaft: 45 m x 11 m x 15 m
    – steel girder shoring with underwater concrete slab and pre-installed lean concrete block
    – dyke crossing structure:
    5 circular cells of secant bored piles (internal diameter approx. 7 m)
    – a tunnel drive through each circular cell

Construction method 

  • Pipe jacking using 2 slurry-supported tunnel boring machines
  • external diameter: 4.1 m
  • Jacking pipes: Composite pipes DN 3400
    consisting of a reinforced concrete pipe with an integrated HDPE pipe liner

Geology

  • Silty sand with bands of clay

 

 

General data

Project
New coal-fired power plant in Wilhelmshaven,
cooling water pipelines, Lot C121

Client
GDF SUEZ Energie Deutschland AG

Contractor 
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period 
December 2009 – August 2011

Construction costs
€ 36 million

Utilisation
Water/ Sewerage
Type
Cooling water tunnel
Length
4 * 300 m
Construction Method
Pipe Jacking
Related Projects
North-South-Link Antwerp (ASDAM)
North-South-Link Antwerp (ASDAM)
Belgium

The North-South link Antwerp is part of the Brussels-Amsterdam high-speed line. The project comprises the reconstruction of the existing accesses, the construction of a passage under the main station as well as the construction of two tunnel sections from „Astridplatz“ to „Damplatz“.

Read more
Mine Water Drainage Tunnel, Ibbenbüren
Mine Water Drainage Tunnel, Ibbenbüren
Germany

Length: approx. 7,400 m 2 drives: West 3,230 m and East 3,8700 m in length Internal diameter: 3.60 m External diameter: 4,50 m bore diameter approx. 4.80 m

Read more
Katzenberg Tunnel
Katzenberg Tunnel
Germany

Parallel drive with two TBMs with EPB shields for the extension of the Karlsruhe – Basel motorway.

Read more