Technical specifications

2 single-track railway tunnels

  • Length: 2 x 6,822 m
  • Internal diameter: 9.60 m

2 cut and cover tunnel sections

  • Each approximately 75 m long
  • 13 cross-passages
  • 2 tunnels for technical purposes

Railway sections in a cutting and on an embankment

  • Lengths: 1,000 m and 340 m

Construction of sonic boom structures at all 4 tunnel portals in order to avoid the sonic boom effect

  • Length: 75 m

Construction method

  • TBM tunnelling using 2 Mixshields (slurry shields)
  • Shield diameter: 10.88 m
  • After 1,500 m conversion of TBMs from slurry shield mode to hard rock mode
  • Segmental lining
  • Thickness of segments: 45 cm
  • Lowering of groundwater table by means of deep wells during tunnelling in open mode (water pressure 6.1 bar)

Geology

  • Buntsandstein (variegated sandstone)
  • Fault zone with Keuper sandstone formations

General data

Project

Finne Tunnel
Part of new Erfurt-Leipzig-Halle railway line
Single-track railway tunnel

Client

DB Netz AG [German rail company]
represented by DB Projekt Bau GmbH
Projektzentrum Leipzig

Contractor

Wayss & Freytag Ingenieurbau AG
as technical leader of a joint leader

Construction period

December 2006 to September 2012

Construction costs

€ 270 million
Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
2 x 6,822 m
Construction Method
TBM tunneling using 2 Mixshields

Related Projects

Related Projects

Emscher Sewerage Tunnel
Emscher Sewerage Tunnel
Germany

47 km sewerage tunnel across the Ruhr area

Read more
Limmern Access Tunnel I
Limmern Access Tunnel I
Switzerland

1,700 m above sea level: In the Linthal Project 2015 the inclined tunnel with an incline of 24 % compensates an altitude difference of 900 m in the high mountains of Switzerland.

Read more
Ems-Dollart-Crossing
Ems-Dollart-Crossing
Netherlands

4 km tunnel for a 48-inch gas pipeline between Rysum (D) near Emden and Midwolda (NL).

Read more