Related Projects
High quality and in time: four cooling water pipelines in pipe jacking drive for a new coal-fired power plant in Wilhelmshaven.
Four-track extension of the Olten–Aarau railway line, Switzerland: the 2.6 km long Eppenberg tunnel helps to eliminate the traffic bottleneck.
2 parallel tunnel tubes with a length of 1.645 km each, inner diameter 10,15 m; 6 cross passages driven under the protection of ground freezing; 2 access ramps, which at the same time function as start and target shafts, Passing under A4/A133 motorways incl. connection to existing infrastructure