Technical specifications

Scope of work

  • Length: 2.2 km, excavated cross-section: 80 m² - 100 m²
  • 2 parking bays, area: 125 m²
  • 6 cross-passages to an existing exploration tunnel
  • Ventilation shaft, diameter: 4m, depth: 38 m
  • Service buildings and emergency exit shafts

Construction method

  • Drill and blast method in combination with tunnel excavator,
    length: 1.4 km;
  • Cut and cover method: 732 m

Geology

  • Ground moraine
  • Flysch sedimentary rock

General data

Project

B 1 Federal Road Wiener Straße
Henndorf Bypass, two-lane road tunnel

Client

Land Salzburg, Landesbaudirektion
[State of Salzburg, State Building Authority]

Contractor

Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period

2006 to 2009

Construction costs

€ 38 million
Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
2.2 km
Construction Method
Drill and blast method in combination with tunnel excavator

Related Projects

Related Projects

Gleinalm Tunnel 2nd tube
Gleinalm Tunnel 2nd tube
Austria

During extension of the Pyhrn motorway, the Gleinalm Tunnel is provided with a second tube. This makes the motorway safer, since there will be no oncoming traffic in the tunnel.

Read more
Rennsteig Tunnel
Rennsteig Tunnel
Germany

The longest motorway tunnel in Germany is the centrepiece of the new A 71 federal motorway from Erfurt to Schweinfurt.

Read more
LSG Tunnel at Frankfurt Airport
LSG Tunnel at Frankfurt Airport
Germany

1 two-lane road tunnel and 1 bridge, total tunnel length 100 m, length of the total section to be built by us under the contract: approx. 520 m

Read more