Technical specifications

Project description

  • Double-track railway tunnel KL=1,695 m
    closed construction method, L=1035 m, A =110-125 m²
    Cut and cover method L=400m
    top-down method L=210 m
  • 3 emergency exits
  • Open land section, L=5,898 m
  • Earthworks, drainage works, noise protection, accompanying paths, retention areas

Objects

  • 1 underpass structure
  • 1 stormwater bridge

Construction method

  • Closed construction method:
    combination of tunnel excavator and drill and blast
  • Cut and cover and top-down method
    with separate bored pile sheeting

Geology

  • Quaternary: Sand, gravel
  • Neogene: sandstone, silt / clay/ marl- rock, silt

General data

Project
Koralmbahn (railway) Graz–Klagenfurt B 1581
Lot 3 – Hengsberg Tunnel,

Client
ÖBB Infrastruktur Bau AG

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
2007 to 2010

Construction costs
€ 76.8 million

Utilisation
Infrastructure
Type
Railway tunnel, double-track
Length
2.730 m
Construction Method
Drill and blast method in combination with tunnel excavator
Related Projects
Roppen Tunnel JV
Roppen Tunnel JV
Austria

The Roppen tunnel between Innsbruck and Landeck in Austria was made safer by the construction of the second tube. The 5,069 meter long tunnel was driven conventionally.

Read more
Silberberg Tunnel
Silberberg Tunnel
Germany

The Silberberg railway tunnel in the Thuringian Forest is part of the new Ebensfeld – Erfurt railway line. The new line connects the old and the new federal states.

Read more
Henndorf Bypass
Henndorf Bypass
Austria

The Henndorf bypass lead to a noticeable relief of traffic congestion. Centrepiece of the bypass is the double lane 2,150 meters long road tunnel, which is now used by approx. 20,000 vehicles per day.

Read more