Technical specifications

Scope of work

  • Bypass tunnel, 605 m,
    excavated cross-section: 28 m², as a D-shaped profile
    with a gradient of 12%
    access via existing headrace tunnel
    (length: 2 km, 19 m² circular cross-section, 12% gradient);
  • Access tunnel, 550 m,
    Excavated cross-section 28 m², as a D-shaped profile;
    exploration borings from above ground to detect cavities in the rock;
    shotcrete inner linings in the bypass tunnel and in places in the headrace tunnel;
    partial removal of the flushed out collapse material from the headrace tunnel;
    closing of the collapse area and the access tunnel by means of a concrete seal

Construction method

  • Mining techniques:
    drill and blast method in combination with tunnel excavator
    and sprayed concrete lining (SCL),
  • Classification of tunnelling operations according to the Q-System,
  • Advance per round: 1.5 m - 4 m

Geology

Quarzite with slate inclusions
uniaxial strength approx. 80 MPa - 120 MPa
Eilrig Shear Zone with highly destabilized zones
(the collapse of the TBM tunnel took place in this zone)

General data

Project

Glendoe Recovery Project
construction of a bypass tunnel around a collapse area
an access tunnel to the headrace tunnel
repair works in the headrace and tailrace tunnel

Client

Scottish Southern Energy (SSE)

Contractor

Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period

January 2010 to March 2012

Construction costs

€ 68 million
Utilisation
Supply
Type
Bypass Tunnel
Length
605 m
Construction Method
drill and blast method in combination with tunnel excavator
Related Projects

Related Projects

Stafelter Tunnel
Stafelter Tunnel
Luxembourg

The approx. 2 km long „Stafelter Berg“ Tunnel, north of Luxembourg city is part of the new motorway section of ‚Route du Nord‘ and consists of two double-lane tubes. The tunnel drive was carried out conventionally and with the drill and blast method.

Read more
Koralm Tunnel KAT 1
Koralm Tunnel KAT 1
Austria

The centrepiece of the 125 km long, double-track high-speed line between Graz and Klagenfurt is simultaneously the key project for the Baltic-Adriatic-Corridor. The Koralm Tunnel improves the traffic link between Graz and Klagenfurt.

Read more
Rennsteig Tunnel
Rennsteig Tunnel
Germany

The longest motorway tunnel in Germany is the centrepiece of the new A 71 federal motorway from Erfurt to Schweinfurt.