Technical specifications

Scope of work:

  • Start shaft diameter: Ø 15 m, depth: 22 m
  • 600 m single-track cross-section excavated area = 36 m²
  • 200 m double-track cross-section excavated area = 70 m²
  • 70 m enlargement section excavated area = 36 m² - 60 m²
  • 30 m branch-off section, three-bay excavated area = 185 m²
  • 100 m station tubes excavated area = 62 m²
  • 80 m station section, three-bay excavated area = 138 m²

Construction method:

  • Sprayed concrete lining (SCL) method with tunnel excavator, partly with pipe umbrella support system
  • cut and cover method:
    western and eastern railhead of the stations with accesses
    100 m closed ramp as a double-track rectangular cross-section
    120 m open ramp as a retained cut

Geology

  • Marl stone
  • weathering zone of sandy, gravelly and silty clays

General data

Project
Dortmund Ostentor Light Railway Line III
Contract Section S10.1, 2nd Stage

Client
Stadt Dortmund, Stadtbahnbauamt
[City of Dortmund, Light Rail Construction Authority]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
March 2002 to December 2005

Construction costs
€ 40 million

Utilisation
Infrastructure
Type
Metro tunnel
Length
1,230 m
Construction Method
SCL method with tunnel excavator, cut and cover method
Related Projects
Stafelter Tunnel
Stafelter Tunnel
Luxembourg

The approx. 2 km long „Stafelter Berg“ Tunnel, north of Luxembourg city is part of the new motorway section of ‚Route du Nord‘ and consists of two double-lane tubes. The tunnel drive was carried out conventionally and with the drill and blast method.

Read more
Hengsberg Tunnel
Hengsberg Tunnel
Austria

A milestone for the Koralm railway line from Graz to Klagenfurt: the double-track tunnel with a length of 1.7 km forms the centrepiece of this construction section.

Read more
Joint power station at river Inn
Joint power station at river Inn
Austria

The new hydroelectric power plant supplies sustainably produced electricity for approx.100,000 households without emitting pollutants in Tyrol and Engadin. Power house and power descent were built by Wayss & Freytag Ingenieurbau.

Read more