Technical specifications

Project description

  • Two-lane road tunnel,
    Length 460 m; A= 95 - 120m²
  • Escape and safety tunnels,
    Length = 328 m, A = 13.5 – 18.3 m²

Construction method
Drill and blast

Geology
Upper shell limestone

General data

Project
Darmsheim Northern Bypass
L1182 Darmsheim Tunnel

Client
Federal Land of Baden-Württemberg
represented by RP Stuttgart

Contractor 
Wayss & Freytag Ingenieurbau AG

Construction period
2015 to 2017

Construction costs
€ 13.5 million

Usage
Infrastructure
Type
Road tunnel, two-lane
Length
Length: 460 m
Construction Method
Drill and blast

Related Projects
Lilienberg Tunnel
Lilienberg Tunnel
Austria

The double-lane road tunnel is the centrepiece of the Völkermarkt bypass. The town centre is relieved from heavy traffic which in turn means a better quality of life for the population.

Read more
Grouft Tunnel
Grouft Tunnel
Luxembourg

A double-lane motorway tunnel with a length of approx. 3 km forms part of the new motorway section of ‚Route du Nord' in the biggest infrastructure project in Luxembourg. The two tubes were carried out with an incline of nearly 5%.

Read more
Light Railway Dortmund “Ostentor”
Light Railway Dortmund “Ostentor”
Germany

New U-railway line in the center of Dortmund will replace the existing overground running tram.

Read more