Technical specifications

Project description

  • Two-lane road tunnel,
    Length 460 m; A= 95 - 120m²
  • Escape and safety tunnels,
    Length = 328 m, A = 13.5 – 18.3 m²

Construction method
Drill and blast

Geology
Upper shell limestone

General data

Project
Darmsheim Northern Bypass
L1182 Darmsheim Tunnel

Client
Federal Land of Baden-Württemberg
represented by RP Stuttgart

Contractor 
Wayss & Freytag Ingenieurbau AG

Construction period
2015 to 2017

Construction costs
€ 13.5 million

Usage
Infrastructure
Type
Road tunnel, two-lane
Length
Length: 460 m
Construction Method
Drill and blast

Related Projects
Wehrhahnlinie (Wehrhahn Line) Lot 2
Wehrhahnlinie (Wehrhahn Line) Lot 2
Germany

Below the protected monument, the „Kaufhof“ building at Kö in the heart of Dusseldorf, a tunnel with a connecting platform to the existing railway station „Heinrich-Heine-Allee” is built, which is exactly situated in the middle of the new “Wehrhahn” line.

Read more
Vienna Underground Line – U2/2
Vienna Underground Line – U2/2 "Taborstraße"
Austria

During the construction of the Vienna underground line 2 extensive dewatering works with approx. 270 wells and approx. six million pumping hours were required. An electronic monitoring and control system made the measure safe.

Read more
Bad Cannstatt Tunnel
Bad Cannstatt Tunnel
Germany

6 km railway tunnel from Stuttgart central railway station to Bad Cannstatt as part of the large-scale project „Stuttgart 21“.

Read more