Technical specifications

Project description

  • Two-lane road tunnel,
    Length 460 m; A= 95 - 120m²
  • Escape and safety tunnels,
    Length = 328 m, A = 13.5 – 18.3 m²

Construction method
Drill and blast

Geology
Upper shell limestone

General data

Project
Darmsheim Northern Bypass
L1182 Darmsheim Tunnel

Client
Federal Land of Baden-Württemberg
represented by RP Stuttgart

Contractor 
Wayss & Freytag Ingenieurbau AG

Construction period
2015 to 2017

Construction costs
€ 13.5 million

Usage
Infrastructure
Type
Road tunnel, two-lane
Length
Length: 460 m
Construction Method
Drill and blast

Related Projects
Light Railway Dortmund “Ostentor”
Light Railway Dortmund “Ostentor”
Germany

New U-railway line in the center of Dortmund will replace the existing overground running tram.

Read more
Silberberg Tunnel
Silberberg Tunnel
Germany

The Silberberg railway tunnel in the Thuringian Forest is part of the new Ebensfeld – Erfurt railway line. The new line connects the old and the new federal states.

Read more
Henndorf Bypass
Henndorf Bypass
Austria

The Henndorf bypass lead to a noticeable relief of traffic congestion. Centrepiece of the bypass is the double lane 2,150 meters long road tunnel, which is now used by approx. 20,000 vehicles per day.

Read more