Related Projects
Sealing wall additional safety measure for a granulate landfill for granulated material from melting chambers from coal-fired power plant block-units.
Strengthening the existing flood protection dyke with a one-phase cut-off wall and guide walls.
Approx. 90,000 m³ diaphragm walls have been built for the construction of Second Waaslandhaven Lock at the Antwerp port in Belgium, the world’s largest lock.