Technical specifications

Area of extension

4,900 m²

Pressing tool pit TryOut

25 m / 17 m / 6.50 m (L/W/D), 11/15: 13 m / 8.60 m / 6.50 m (L/W/D)


Structural concrete

3,700 m³

Reinforcement

420 t

Sheet piling profile Larssen 604

1,875 m²

Constructional steel (Reinforcement, mounting parts)

65 t

Concrete support column

5,750 m

Full displacement piles

1,050 m

 

General data

Project

Extension building 66, Production Facility for operating material, Bremen plant

Client

Grundstücksverwaltungsgesellschaft (land agent)
Mercedes Benz AG & Co. OHG

Contractor

Wayss & Freytag Ingenieurbau AG, Bereich Nord (Area North),
Niederlassung Berlin (Berlin branch), Straße der Jugend 58, 14974 Ludwigsfelde


Project planning

Knebel + Schumacher


Structural engineering

Neidenburger Straße 26, 28207 Bremen

Construction period

February 2012 to January 2013

Contract value

3.4 m €

The Bremen plant of Daimler AG is Mercedes’ second largest passenger car plant worldwide. In February 2012, Wayss & Freytag Ingenieurbau AG, Area North, was awarded the contract for the special foundation and reinforced concrete works for the extension to the south of the existing building 66. The extension of the production facility with a building area of 4,900 m² planned by Daimler was ready for operation as a so-called „TryOut-Center” within the extremely short period of less than one year. The sheet pile walls of the construction pits „TryOut and 11/15“ with a total area of 700 m² were built with the grouting method. For the special foundation works 4,800 m³ were excavated and 5,750 m concrete supporting piles as well as 107 full displacement piles, Ø 44/56 cm built. The reinforced concrete works of the two watertight pits and the construction of the reinforced concrete slab with a total of 420 t reinforcing steel and 3,700 m³ concrete were partly carried out at the same time as the civil engineering works.

Related Projects

Related Projects

Sewerage Pumping Station Berlin-Friedrichshain
Sewerage Pumping Station Berlin-Friedrichshain
Germany

Works clearly within schedule, good quality and cost reduction: convincing facts for the client during the construction of the sewerage pumping station.

Read more
Refurbishment Kreuzbauten in Bonn
Refurbishment Kreuzbauten in Bonn
Germany

A listed property of the German Federation was rehabilitated without interrupting operations.

Read more
Germany

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s

Read more