Technical specifications

Scope of work

  • Bypass tunnel, 605 m,
    excavated cross-section: 28 m², as a D-shaped profile
    with a gradient of 12%
    access via existing headrace tunnel
    (length: 2 km, 19 m² circular cross-section, 12% gradient);
  • Access tunnel, 550 m,
    Excavated cross-section 28 m², as a D-shaped profile;
    exploration borings from above ground to detect cavities in the rock;
    shotcrete inner linings in the bypass tunnel and in places in the headrace tunnel;
    partial removal of the flushed out collapse material from the headrace tunnel;
    closing of the collapse area and the access tunnel by means of a concrete seal

Construction method

  • Mining techniques:
    drill and blast method in combination with tunnel excavator
    and sprayed concrete lining (SCL),
  • Classification of tunnelling operations according to the Q-System,
  • Advance per round: 1.5 m - 4 m

Geology
Quarzite with slate inclusions
uniaxial strength approx. 80 MPa - 120 MPa
Eilrig Shear Zone with highly destabilized zones
(the collapse of the TBM tunnel took place in this zone)

General data

Project
Glendoe Recovery Project
construction of a bypass tunnel around a collapse area
an access tunnel to the headrace tunnel
repair works in the headrace and tailrace tunnel

Client
Scottish Southern Energy (SSE)

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
January 2010 to March 2012

Construction costs
€ 68 million

Utilisation
Supply
Type
Bypass Tunnel
Length
605 m
Construction Method
drill and blast method in combination with tunnel excavator
Related Projects
Klaus Tunnel String 2nd Tubes Lots 4+5
Klaus Tunnel String 2nd Tubes Lots 4+5
Austria

The extension of the Klaus tunnel string with the 2nd tubes on the A9 Pyhrn motorway in Austria means the end of oncoming traffic and thus provides better safety for 18,000 drivers per day.

Read more
Roppen Tunnel JV
Roppen Tunnel JV
Austria

The Roppen tunnel between Innsbruck and Landeck in Austria was made safer by the construction of the second tube. The 5,069 meter long tunnel was driven conventionally.