Technical specifications

Scope of work

  • 2 tunnels, each 4.4 km long
  • Excavated area: 160 m²

Construction method

  • Soft ground tunnelling: approx. 1.6 km in 7 sections
  • Drill and blast tunnelling: approx. 1.2 km in 3 sections
  • Pilot TBM (5 m diameter): 5.6 km
  • Tunnel bore extender TBE (14.40 m diameter): 5.6 km
  • Cut and cover method: approx. 0.4 km

Geology

  • Molasse (partly eroded at the end of the tunnels)
  • Moraine

General data

Project

Uetliberg Motorway Tunnel
two parallel tunnels, each for three lanes

Client

Baudirekton Kanton Zürich
[Building Authority of the Canton of Zurich]

Contractor

Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period

2000 to 2007

Construction costs

€ 340 million
Utilisation
Infrastructure
Type
Road Tunnel
Length
2 * 4.4 km
Construction Method
drill and blast tunneling
Related Projects

Related Projects

Crossrail Western Tunnels
Crossrail Western Tunnels
Great Britain

Railway tunnel and stations for the London railway system in one of the most advanced railway projects in Europe.

Read more
Oenzberg Tunnel
Oenzberg Tunnel
Switzerland

The 3.1 km long Oenzberg tunnel is part of the new Mattstetten-Rothrist railway line in Switzerland. This railway line improves the connection between Bern and Olten.

Read more
Weser crossing
Weser crossing
Germany

1 four-lane motorway tunnel, total tunnel length 1,100 m, length of total section on our behalf approx. 4,800m.