Technical specifications

Scope of work

  • 2 tunnels, each 4.4 km long
  • Excavated area: 160 m²

Construction method

  • Soft ground tunnelling: approx. 1.6 km in 7 sections
  • Drill and blast tunnelling: approx. 1.2 km in 3 sections
  • Pilot TBM (5 m diameter): 5.6 km
  • Tunnel bore extender TBE (14.40 m diameter): 5.6 km
  • Cut and cover method: approx. 0.4 km

Geology

  • Molasse (partly eroded at the end of the tunnels)
  • Moraine

General data

Project
Uetliberg Motorway Tunnel
two parallel tunnels, each for three lanes

Client
Baudirekton Kanton Zürich
[Building Authority of the Canton of Zurich]

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2000 to 2007

Construction costs
€ 340 million

Utilisation
Infrastructure
Type
Road Tunnel
Length
2 * 4.4 km
Construction Method
drill and blast tunneling
Related Projects
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Germany

A new sewerage canal through the southwest of Munich relieves the existing canal system.

Read more
Crossrail Western Tunnels
Crossrail Western Tunnels
Great Britain

Railway tunnel and stations for the London railway system in one of the most advanced railway projects in Europe.

Read more
Pipe Jacking under Leipzig Main Station
Pipe Jacking under Leipzig Main Station
Germany

During the construction of the Leipzig City Tunnel in the shopping centre under the station concourse of Leipzig Main station it was not possible to carry out any works from above ground. Therefore, two pilot tunnels were driven by pipe jacking so that vertical freezing bulkheads could be built.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings