Technical specifications

Scope of work

  • 2 tunnels, each 4.4 km long
  • Excavated area: 160 m²

Construction method

  • Soft ground tunnelling: approx. 1.6 km in 7 sections
  • Drill and blast tunnelling: approx. 1.2 km in 3 sections
  • Pilot TBM (5 m diameter): 5.6 km
  • Tunnel bore extender TBE (14.40 m diameter): 5.6 km
  • Cut and cover method: approx. 0.4 km

Geology

  • Molasse (partly eroded at the end of the tunnels)
  • Moraine

General data

Project
Uetliberg Motorway Tunnel
two parallel tunnels, each for three lanes

Client
Baudirekton Kanton Zürich
[Building Authority of the Canton of Zurich]

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2000 to 2007

Construction costs
€ 340 million

Utilisation
Infrastructure
Type
Road Tunnel
Length
2 * 4.4 km
Construction Method
drill and blast tunneling
Related Projects
Cross River Rail Project
Cross River Rail Project
Australia

The State of Queensland in Australia expects new urban development and economic opportunities from the Cross River Rail infrastructure project. Wayss & Freytag Ingenieurbau is involved in this ambitious infrastructure project.

Read more
SMART Tunnel
SMART Tunnel
Malaysia

A clever solution: What is normally a road tunnel turns into a storm water relief tunnel during floods. The storm water management and road tunnel in Malaysia is the answer to two challenges.

Read more
Metro Singapore, North-East Line, Lot
Metro Singapore, North-East Line, Lot
Singapore

2.5 km long underground railway line in a double-tube underground track system for the North-East-Line (NEL) in Singapore with two stations, two underground passages and a flyover.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings