Technical specifications

Scope of work

  • 2 tunnels, each 4.4 km long
  • Excavated area: 160 m²

Construction method

  • Soft ground tunnelling: approx. 1.6 km in 7 sections
  • Drill and blast tunnelling: approx. 1.2 km in 3 sections
  • Pilot TBM (5 m diameter): 5.6 km
  • Tunnel bore extender TBE (14.40 m diameter): 5.6 km
  • Cut and cover method: approx. 0.4 km

Geology

  • Molasse (partly eroded at the end of the tunnels)
  • Moraine

General data

Project
Uetliberg Motorway Tunnel
two parallel tunnels, each for three lanes

Client
Baudirekton Kanton Zürich
[Building Authority of the Canton of Zurich]

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2000 to 2007

Construction costs
€ 340 million

Utilisation
Infrastructure
Type
Road Tunnel
Length
2 * 4.4 km
Construction Method
drill and blast tunneling
Related Projects
Crossrail Western Tunnels
Crossrail Western Tunnels
Great Britain

Upgrade for London’s Wastewater System

Read more
Channel Tunnel Rail Link
Channel Tunnel Rail Link
Great Britain

Simultaneous drive of two tunnel tubes with two EPB shields for the high-speed Channel Tunnel Rail Link.

Read more
Grand Paris Express, Linie 17, Section 1, Bonneuil-en-France
Grand Paris Express, Linie 17, Section 1, Bonneuil-en-France
Germany

New traffic connection for Paris. Europe's largest infrastructure project improves transportation networks in the greater Paris area.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings