Technical specifications

Scope of work

  • 2 tunnel tubes
    length: 2,550 m each, internal diameter: 5.80 m
  • 6 cross-passages at intervals of 250 m
  • 2 stations:
    Serangoon Station, 205 m long
    Woodleigh Station, 210 m long,
    built in an open excavation supported by shoring (soldier piles and timber lagging)
    designed as civil defence shelters, turn-key
  • 1 viaduct with 2 separate superstructures with 2 x 3 lanes
    length: 1,750 m, width: 2 x 11.40 m
    using overhead launching system and the free cantilever method for large-span areas
  • Contiguous bored pile walls for Braddell Bartley Underpass
    approx. 1 km long, and soldier piles and timber lagging for the excavation of the Upper Paya Lebar Underpass box structure
  • extensive roadworks
  • 3 pedestrian bridges
  • 1 switching substation

Construction method

  • TBM tunnelling using 2 EPB shields
  • Shield diameter: 6.56 m
  • Cross-passages built using NATM techniques with an in-situ concrete inner lining

Geology

  • Sand
  • Clay
  • Granite

General data

Project
Singapore Metro, North East Line, Contract C704,
single-track metro tunnel

Client
Land Transport Authority of Singapore (LTA)

Contractor
Wayss & Freytag AG
as technical and commercial leader of a joint venture

Construction period
1997 to 2002

Construction costs
€ 177 million

Utilisation
Infrastructure
Type
Metro tunnel, single-track
Length
2 * 2,550 m
Construction Method
TBM tunneling using a EPB shield
Related Projects
New Culvert Brunsbüttel Lock
New Culvert Brunsbüttel Lock
Germany

Increase in the shipping capacity of the Kiel Canal (Nord-Ostsee-Kanal): Pipe jacking for a pipeline tunnel 35 m below ground during ongoing lock operation.

Read more
Hubertus Tunnel
Hubertus Tunnel
Netherlands

A first in the Netherlands - TBM drive in the city centre: Hubertus tunnel, the longest inner-city road tunnel in the Netherlands, completes the Northern “Randweg” of The Hague.

Read more
Channel Tunnel Rail Link
Channel Tunnel Rail Link
Great Britain

Simultaneous drive of two tunnel tubes with two EPB shields for the high-speed Channel Tunnel Rail Link.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings