Technical specifications

Scope of work

  • 2 double-lane tunnels
    each 1,490 m long
    internal diameter: 9.40 m
  • 2 ramp structures
  • 5 cross-passages

Construction method

  • TBM tunnelling using a Mixshield (slurry shield)
  • External diameter of TBM: 10.50 m
  • Reinforced concrete segmental lining

Geology
Silty fine sands to medium dense beach sands

General data

Project
Hubertus Tunnel
Road tunnel

Client
Gemeente Den Haag [Municipality of The Hague]
the Netherlands

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
September 2004 to September 2008

Construction costs
€ 109 million

Utilisation
Infrastruktur
Type
Road Tunnel
Length
2 * 1,490 m
Construction Method
TBM tunneling using a Mixshield
Related Projects
Seepage Water Tunnel „Sylvensteinspeicher“
Seepage Water Tunnel „Sylvensteinspeicher“
Germany

Rehabilitation of the water reservoir ensures the flood protection in the Isar valley. The construction section comprises the construction of the seepage water tunnel as well as the access structures at both ends of the tunnel.

Read more
Diabolo Project
Diabolo Project
Belgium

Railway tunnel provides a modern connection of Zaventem airport close to Brussels to the European high-speed railway system and to E 19 motorway.

Read more
Weinberg Tunnel, Lots 3.1 and 3.2
Weinberg Tunnel, Lots 3.1 and 3.2
Switzerland

The Zurich main station - Altstetten - Oerlikon cross-city line forms the central part of the West- East-axis of the Swiss railway lines. The Weinberg tunnel is the centrepiece of the cross-city line and connects the new through station “Löwenstraße” in Zurich with Oerlikon station.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings