Technical specifications

Scope of work

  • 2 double-lane tunnels
    each 1,490 m long
    internal diameter: 9.40 m
  • 2 ramp structures
  • 5 cross-passages

Construction method

  • TBM tunnelling using a Mixshield (slurry shield)
  • External diameter of TBM: 10.50 m
  • Reinforced concrete segmental lining

Geology
Silty fine sands to medium dense beach sands

General data

Project
Hubertus Tunnel
Road tunnel

Client
Gemeente Den Haag [Municipality of The Hague]
the Netherlands

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
September 2004 to September 2008

Construction costs
€ 109 million

Utilisation
Infrastruktur
Type
Road Tunnel
Length
2 * 1,490 m
Construction Method
TBM tunneling using a Mixshield
Related Projects
Limmern Access Tunnel I
Limmern Access Tunnel I
Switzerland

1,700 m above sea level: In the Linthal Project 2015 the inclined tunnel with an incline of 24 % compensates an altitude difference of 900 m in the high mountains of Switzerland.

Read more
Channel Tunnel Rail Link
Channel Tunnel Rail Link
Great Britain

Simultaneous drive of two tunnel tubes with two EPB shields for the high-speed Channel Tunnel Rail Link.

Read more
Ems-Dollart-Crossing
Ems-Dollart-Crossing
Netherlands

4 km tunnel for a 48-inch gas pipeline between Rysum (D) near Emden and Midwolda (NL).

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings