Technical specifications

Scope of work

  • Tunnel for a gas pipeline
  • Length: approx. 4,050 m
  • Internal diameter: 3.0 m
  • start and target shaft
  • installation of the gas pipeline in the tunnel
    using the floating method and subsequent backfill grouting of the tunnel
  • extensive soil investigation

Construction method

  • TBM tunnelling using a Hydroshield (slurry shield)
  • Shield diameter: 3.6 m
  • Steel fibre reinforced segmental lining
  • Wall thickness 25 cm

Geology

  • Potklei (local type of clay)
  • Sands
  • Clays

 

 

 

General data

Project
Ems-Dollard Crossing between Germany and the Netherlands
tunnel for a gas pipeline

Client
Nederlandse Gasunie

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
June 2008 to September 2010

Construction costs
€ 45.7 million

Utilisation
Media / Supply
Type
Cable tunnel
Length
4,050 m
Construction Method
TBM tunneling using a Hydroshield (slurry method)
Related Projects
Diabolo Project
Diabolo Project
Belgium

Railway tunnel provides a modern connection of Zaventem airport close to Brussels to the European high-speed railway system and to E 19 motorway.

Read more
New Coal-Fired Power Plant in Wilhelmshaven
New Coal-Fired Power Plant in Wilhelmshaven
Germany

High quality and in time: four cooling water pipelines in pipe jacking drive for a new coal-fired power plant in Wilhelmshaven.

Read more
Corrib Pipeline Tunnel
Corrib Pipeline Tunnel
Ireland

Tunnel for a gas pipeline under Scruwaddacon Bay, Ireland was awarded the prize for best environmental initiative 2015 during the Tunnelling Awards at the International Tunelling Association.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings