Technical specifications

Scope of works:

  • Construction of a sewerage tunnel
  • length: 6.950 m
  • internal diameter 7,10 m
  • external diameter 7,80 m
  • 7 shafts

Construction method:

  • TBM tunnelling using an EPB shield
  • shield diameter 8.13 m
  • Tunnel lining with 8 trapezoid segments per ring, 350 mm thick, 1.70 m wide

Geology

  • London Clay

General data

Project
Thames Tideway Tunnel,
Contract C405, Tideway West,
London, UK

Client
Tideway (Bazalgette Tunnel Limited),
London, United Kingdom

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2015 to 2021

Construction costs
GBP 416 million

Utilisation
Water/Sewerage
Type
Sewerage tunnel
Length
6.950 m
Construction Method
TBM tunnelling using an EPB shield

More information:

London’s water and wastewater system provider, Thames Water, is improving its water quality through a three-stage upgrade. Thames Tideway Tunnel is intended to carry sewerage from 34 of London’s largest combined overflows over a length of 25 km, store and transfer it to Lee Tunnel from 2023 on. The main tunnel will have an internal diameter of 7.2 m and start at a depth of approx. 30 m in Acton. From there the tunnel follows the course of the Thames through and under London’s central business district and terminating at a depth of 70 m at Abbey Mills Pumping Station.

Related Projects
Corrib Pipeline Tunnel
Corrib Pipeline Tunnel
Ireland

Tunnel for a gas pipeline under Scruwaddacon Bay, Ireland was awarded the prize for best environmental initiative 2015 during the Tunnelling Awards at the International Tunelling Association.

Read more
Westerschelde Tunnel
Westerschelde Tunnel
Netherlands

The Westerschelde tunnel ensured the first safe connection between the provinces of Zeeuwsch-Vlaanderen and Zuid-Beveland in the Netherlands. High water pressures in connection with loose soil posed new challenges to tunnel construction.

Read more
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Germany

A new sewerage canal through the southwest of Munich relieves the existing canal system.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings