Technical specifications

Scope of work

  • 2 parallel railway tunnels
  • length: 5.3 km each
  • internal diameter: 7.15 m
  • 7 cross-passages
  • 1 ventilation shaft

Construction method

  • TBM tunnelling using 2 EPB shields
  • shield diameter: 8.15 m
  • steel fibre reinforced segmental lining
  • both tunnels driven simultaneously from a retained cut structure

Geology

  • Sand
  • London Clay
  • Silt
  • Gravel

General data

Project
Channel Tunnel Rail Link
Contract C250
single-track railway tunnel

Client
Union Railways (North) Ltd.,
London, UK

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
February 2001 to September 2004

Construction costs
€ 217 m

Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
2 * 5.3 km
Construction Method
TBM tunneling using a EPB shield
Related Projects
Munich Underground, Line 3 North, Lot 2
Munich Underground, Line 3 North, Lot 2
Germany

The new underground line provides a connection between the Moosach district and the „Olympia” shopping centre which was also built by W&F Ingenieurbau.

Read more
Westerschelde Tunnel
Westerschelde Tunnel
Netherlands

The Westerschelde tunnel ensured the first safe connection between the provinces of Zeeuwsch-Vlaanderen and Zuid-Beveland in the Netherlands. High water pressures in connection with loose soil posed new challenges to tunnel construction.

Read more
Emscher Sewerage Tunnel
Emscher Sewerage Tunnel
Germany

47 km sewerage tunnel across the Ruhr area

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings