Technical specifications

Scope of work
Construction of two pilot tunnels
in the course of the construction of Leipzig City Tunnel,
Section C

Length

  • 110 m and 145 m
  • Internal diameter: 2.40 m

Construction method

Pipe jacking with a slurry-supported tunnel face

  • AVN 2000 tunnelling machine
  • External diameter: 2,400 mm
  • Enlarged to 3,000 mm

Wall thickness of jacking pipes 

  • 30 cm, standard length: 3 m;
  • Max. settlement 3 mm

Geology

  • Sand
  • Gravel

General data

Project 
Pipe jacking under Leipzig Main Station

Client 
City Tunnel Leipzig Joint Venture consisting of

  • Wayss & Freytag Ingenieurbau AG
  • and Strabag AG

Contractor 
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
October 2006 to July 2007

Construction costs
€ 2.8 million

Utilisation
Infrastructure
Type
Pilot tunnel
Length
110 and 145 m
Construction Method
Pipe Jacking
Related Projects
North-South-Link Antwerp (ASDAM)
North-South-Link Antwerp (ASDAM)
Belgium

The North-South link Antwerp is part of the Brussels-Amsterdam high-speed line. The project comprises the reconstruction of the existing accesses, the construction of a passage under the main station as well as the construction of two tunnel sections from „Astridplatz“ to „Damplatz“.

Read more
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Germany

A new sewerage canal through the southwest of Munich relieves the existing canal system.

Read more
Crossrail Western Tunnels
Crossrail Western Tunnels
Great Britain

Railway tunnel and stations for the London railway system in one of the most advanced railway projects in Europe.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings