Technical specifications

Scope of work
2 single-track metro tunnels

  • Total length: 2,410 m
  • Internal diameter: 6.30 m

Construction of Moosach and Moosacher St.-Martins-Platz Stations

Construction method 

  • TBM tunnelling using a Hydroshield (slurry shield)
  • Shield diameter: 7.34 m
  • Segmental lining
  • Construction of metro stations using the top-down method

Geology

  • Gravel
  • Clay
  • Silt

 

 

 

General data

Project
Munich Metro, Line 3 North, Section 2
single-track metro

Client 
Landeshauptstadt München, Baureferat U-Bahn
[State Capital of Munich, Building Division - Underground Railway]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
September 2004 to February 2010

Construction costs
€ 81 million

Utilisation
Infrastructure
Type
Metro tunnel, single-track
Length
2,410 m
Construction Method
TBM tunneling using a Hydroshield (slurry shield)
Related Projects
Ems-Dollart-Crossing
Ems-Dollart-Crossing
Netherlands

4 km tunnel for a 48-inch gas pipeline between Rysum (D) near Emden and Midwolda (NL).

Read more
Westerschelde Tunnel
Westerschelde Tunnel
Netherlands

The Westerschelde tunnel ensured the first safe connection between the provinces of Zeeuwsch-Vlaanderen and Zuid-Beveland in the Netherlands. High water pressures in connection with loose soil posed new challenges to tunnel construction.

Read more
New Coal-Fired Power Plant in Wilhelmshaven
New Coal-Fired Power Plant in Wilhelmshaven
Germany

High quality and in time: four cooling water pipelines in pipe jacking drive for a new coal-fired power plant in Wilhelmshaven.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings