Technical specifications

Scope of work
2 single-track metro tunnels

  • Total length: 2,410 m
  • Internal diameter: 6.30 m

Construction of Moosach and Moosacher St.-Martins-Platz Stations

Construction method 

  • TBM tunnelling using a Hydroshield (slurry shield)
  • Shield diameter: 7.34 m
  • Segmental lining
  • Construction of metro stations using the top-down method

Geology

  • Gravel
  • Clay
  • Silt

 

 

 

General data

Project
Munich Metro, Line 3 North, Section 2
single-track metro

Client 
Landeshauptstadt München, Baureferat U-Bahn
[State Capital of Munich, Building Division - Underground Railway]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
September 2004 to February 2010

Construction costs
€ 81 million

Utilisation
Infrastructure
Type
Metro tunnel, single-track
Length
2,410 m
Construction Method
TBM tunneling using a Hydroshield (slurry shield)
Related Projects
Weinberg Tunnel, Lots 3.1 and 3.2
Weinberg Tunnel, Lots 3.1 and 3.2
Switzerland

The Zurich main station - Altstetten - Oerlikon cross-city line forms the central part of the West- East-axis of the Swiss railway lines. The Weinberg tunnel is the centrepiece of the cross-city line and connects the new through station “Löwenstraße” in Zurich with Oerlikon station.

Read more
Oenzberg Tunnel
Oenzberg Tunnel
Switzerland

The 3.1 km long Oenzberg tunnel is part of the new Mattstetten-Rothrist railway line in Switzerland. This railway line improves the connection between Bern and Olten.

Read more
Channel Tunnel Rail Link
Channel Tunnel Rail Link
Great Britain

Simultaneous drive of two tunnel tubes with two EPB shields for the high-speed Channel Tunnel Rail Link.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings