Technical specifications

Scope of work
2 single-track metro tunnels

  • Total length: 2,410 m
  • Internal diameter: 6.30 m

Construction of Moosach and Moosacher St.-Martins-Platz Stations

Construction method 

  • TBM tunnelling using a Hydroshield (slurry shield)
  • Shield diameter: 7.34 m
  • Segmental lining
  • Construction of metro stations using the top-down method

Geology

  • Gravel
  • Clay
  • Silt

 

 

 

General data

Project
Munich Metro, Line 3 North, Section 2
single-track metro

Client 
Landeshauptstadt München, Baureferat U-Bahn
[State Capital of Munich, Building Division - Underground Railway]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
September 2004 to February 2010

Construction costs
€ 81 million

Utilisation
Infrastructure
Type
Metro tunnel, single-track
Length
2,410 m
Construction Method
TBM tunneling using a Hydroshield (slurry shield)
Related Projects
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Landsberger Straße Sewer System Rehabilitation, Section 2, Munich
Germany

A new sewerage canal through the southwest of Munich relieves the existing canal system.

Read more
Eppenberg Tunnel
Eppenberg Tunnel
Switzerland

Four-track extension of the Olten–Aarau railway line, Switzerland: the 2.6 km long Eppenberg tunnel helps to eliminate the traffic bottleneck.

Read more
Korsvägen Göteborg, Västlanken
Korsvägen Göteborg, Västlanken
Germany

Six kilometers of rail tunnels under the city center of Gothenburg, Sweden are the heart of the West Link Project - creating new connections.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings