Technical specifications

Scope of work
2 single-track metro tunnels

  • Total length: 2,410 m
  • Internal diameter: 6.30 m

Construction of Moosach and Moosacher St.-Martins-Platz Stations

Construction method 

  • TBM tunnelling using a Hydroshield (slurry shield)
  • Shield diameter: 7.34 m
  • Segmental lining
  • Construction of metro stations using the top-down method

Geology

  • Gravel
  • Clay
  • Silt

 

 

 

General data

Project
Munich Metro, Line 3 North, Section 2
single-track metro

Client 
Landeshauptstadt München, Baureferat U-Bahn
[State Capital of Munich, Building Division - Underground Railway]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
September 2004 to February 2010

Construction costs
€ 81 million

Utilisation
Infrastructure
Type
Metro tunnel, single-track
Length
2,410 m
Construction Method
TBM tunneling using a Hydroshield (slurry shield)
Related Projects
Emscher Sewerage Tunnel
Emscher Sewerage Tunnel
Germany

47 km sewerage tunnel across the Ruhr area

Read more
Corrib Pipeline Tunnel
Corrib Pipeline Tunnel
Ireland

Tunnel for a gas pipeline under Scruwaddacon Bay, Ireland was awarded the prize for best environmental initiative 2015 during the Tunnelling Awards at the International Tunelling Association.

Read more
Uetliberg Tunnel
Uetliberg Tunnel
Switzerland

Greatly varying geology required different driving methods during the construction of the Uetliberg Tunnel in Switzerland. The 4.4 km long road tunnel connects the Birmensdorf bypass with the existing national road Zurich-Chur.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings