Technical specifications

Scope of work

  • Construction of two tunnels
    Length: 2,456 m (2 x 1,228 m)
    Internal diameter: 7.30 m
  • Structural modification of the existing accesses
  • Construction of a passageway under the main railway station
  • 3 emergency exits
  • 2 cross-passages

Construction method

  • TBM tunnelling using a Mixshield (slurry shield)
    Shield diameter: 8.27 m

Geology
Sand

General data

Project
Antwerp North-South Link (ASDAM)
single-track railway tunnel

Client
NMBS CCE Strategie Ontwikkeling (Belgian Railway)
represented by: TUC RAIL NV, Brussels, Belgium

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
May 2001 to March 2005

Construction costs
€ 81 million

Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
2,456 m (2 * 1,228 m)
Construction Method
TBM tunneling using a Mixshield (slurry shield)
Related Projects
Metro Singapore, North-East Line, Lot
Metro Singapore, North-East Line, Lot
Singapore

2.5 km long underground railway line in a double-tube underground track system for the North-East-Line (NEL) in Singapore with two stations, two underground passages and a flyover.

Read more
Diabolo Project
Diabolo Project
Belgium

Railway tunnel provides a modern connection of Zaventem airport close to Brussels to the European high-speed railway system and to E 19 motorway.

Read more
Sluiskil Channel Crossing
Sluiskil Channel Crossing
Netherlands

Double-tube road tunnel under the Gent-Terneuzen Canal provides a new connection between the important ports of the Netherlands in the north and those of Flanders in the south.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings