Technical specifications

Scope of work

  • 3 shafts, depth: 100 m, max. diameter: 25 m;
  • 2 caverns with a volume of 70,000 m³ and 100,000 m³ respectively
  • Various smaller tunnels

Construction method

  • Sprayed concrete lining method with excavator and chisel,
  • In-situ concrete inner lining

Geology
Molasse

General data

Project
Complete remodelling of the particle accelerator

Client
CERN – European Organization for Nuclear Research

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
1998 to 2003

Construction costs
€ 70 million

Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
3.6 km
Construction Method
Sprayed concrete lining (SCL) method with excavator and chisel
Related Projects
Vienna Underground Line – U2/2
Vienna Underground Line – U2/2 "Taborstraße"
Austria

During the construction of the Vienna underground line 2 extensive dewatering works with approx. 270 wells and approx. six million pumping hours were required. An electronic monitoring and control system made the measure safe.

Read more
Light Railway Dortmund “Ostentor”
Light Railway Dortmund “Ostentor”
Germany

New U-railway line in the center of Dortmund will replace the existing overground running tram.

Read more
Stuttgart Underground Line, U6 Fasanenhof
Stuttgart Underground Line, U6 Fasanenhof
Germany

The U6 underground line connects the district of Möhringen with the industrial area “Am Schelmenwasen”. The double-track underground railway tunnel crosses below the industrial area „Fasanenhof”.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings