Technical specifications

Scope of work

  • 3 shafts, depth: 100 m, max. diameter: 25 m;
  • 2 caverns with a volume of 70,000 m³ and 100,000 m³ respectively
  • Various smaller tunnels

Construction method

  • Sprayed concrete lining method with excavator and chisel,
  • In-situ concrete inner lining

Geology
Molasse

General data

Project
Complete remodelling of the particle accelerator

Client
CERN – European Organization for Nuclear Research

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
1998 to 2003

Construction costs
€ 70 million

Utilisation
Infrastructure
Type
Railway tunnel, single-track
Length
3.6 km
Construction Method
Sprayed concrete lining (SCL) method with excavator and chisel
Related Projects
Henndorf Bypass
Henndorf Bypass
Austria

The Henndorf bypass lead to a noticeable relief of traffic congestion. Centrepiece of the bypass is the double lane 2,150 meters long road tunnel, which is now used by approx. 20,000 vehicles per day.

Read more
Reconstruction of suburban train station under Dortmund Main Station
Reconstruction of suburban train station under Dortmund Main Station
Germany

Accessibility and a steady increase in ridership place new demands on the infrastructure of the city railway station Dortmund. Conversion and extension of the light rail system provide the sustainability safely.

Read more
Tridel Tunnel
Tridel Tunnel
Switzerland

Due to an advantageous layout of tunnel portal and tunnel excavator is was possible to do without shunting bays and laborious shunting during the construction of the single-track railway tunnel.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings