Technical specifications

Scope of work

  • Length: 5.1 km
  • Excavated cross-section: 80 m² - 95 m²
  • 7 emergency lay-bys
  • 23 cross-passages

Construction method
Sprayed concrete lining (SCL) method
with drill and blast excavation

Geology
Dolomite (dolomia principale)

General data

Project
Roppen Tunnel, Second Tube,
two-lane motorway tunnel and adaptation of first tube

Client
ASFINAG Baumanagement GmbH, Vienna

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2006 to 2010

Construction costs
€ 80 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
5.1 km
Construction Method
Sprayed concrete lining (SCL) method with drill and blast excavation
Related Projects
Stafelter Tunnel
Stafelter Tunnel
Luxembourg

The approx. 2 km long „Stafelter Berg“ Tunnel, north of Luxembourg city is part of the new motorway section of ‚Route du Nord‘ and consists of two double-lane tubes. The tunnel drive was carried out conventionally and with the drill and blast method.

Read more
Tridel Tunnel
Tridel Tunnel
Switzerland

Due to an advantageous layout of tunnel portal and tunnel excavator is was possible to do without shunting bays and laborious shunting during the construction of the single-track railway tunnel.

Read more
Grouft Tunnel
Grouft Tunnel
Luxembourg

A double-lane motorway tunnel with a length of approx. 3 km forms part of the new motorway section of ‚Route du Nord' in the biggest infrastructure project in Luxembourg. The two tubes were carried out with an incline of nearly 5%.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings