Technical specifications

Scope of work

  • Length: 5.1 km
  • Excavated cross-section: 80 m² - 95 m²
  • 7 emergency lay-bys
  • 23 cross-passages

Construction method
Sprayed concrete lining (SCL) method
with drill and blast excavation

Geology
Dolomite (dolomia principale)

General data

Project
Roppen Tunnel, Second Tube,
two-lane motorway tunnel and adaptation of first tube

Client
ASFINAG Baumanagement GmbH, Vienna

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2006 to 2010

Construction costs
€ 80 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
5.1 km
Construction Method
Sprayed concrete lining (SCL) method with drill and blast excavation
Related Projects
Reconstruction of suburban train station under Dortmund Main Station
Reconstruction of suburban train station under Dortmund Main Station
Germany

Accessibility and a steady increase in ridership place new demands on the infrastructure of the city railway station Dortmund. Conversion and extension of the light rail system provide the sustainability safely.

Read more
Stuttgart Underground Line, U6 Fasanenhof
Stuttgart Underground Line, U6 Fasanenhof
Germany

The U6 underground line connects the district of Möhringen with the industrial area “Am Schelmenwasen”. The double-track underground railway tunnel crosses below the industrial area „Fasanenhof”.

Read more
Koralm Tunnel KAT 1
Koralm Tunnel KAT 1
Austria

The centrepiece of the 125 km long, double-track high-speed line between Graz and Klagenfurt is simultaneously the key project for the Baltic-Adriatic-Corridor. The Koralm Tunnel improves the traffic link between Graz and Klagenfurt.

Read more