Technical specifications

Scope of work

  • Length: 5.1 km
  • Excavated cross-section: 80 m² - 95 m²
  • 7 emergency lay-bys
  • 23 cross-passages

Construction method
Sprayed concrete lining (SCL) method
with drill and blast excavation

Geology
Dolomite (dolomia principale)

General data

Project
Roppen Tunnel, Second Tube,
two-lane motorway tunnel and adaptation of first tube

Client
ASFINAG Baumanagement GmbH, Vienna

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2006 to 2010

Construction costs
€ 80 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
5.1 km
Construction Method
Sprayed concrete lining (SCL) method with drill and blast excavation
Related Projects
Grouft Tunnel
Grouft Tunnel
Luxembourg

A double-lane motorway tunnel with a length of approx. 3 km forms part of the new motorway section of ‚Route du Nord' in the biggest infrastructure project in Luxembourg. The two tubes were carried out with an incline of nearly 5%.

Read more
Lilienberg Tunnel
Lilienberg Tunnel
Austria

The double-lane road tunnel is the centrepiece of the Völkermarkt bypass. The town centre is relieved from heavy traffic which in turn means a better quality of life for the population.

Read more
Stuttgart Underground Line, U6 Fasanenhof
Stuttgart Underground Line, U6 Fasanenhof
Germany

The U6 underground line connects the district of Möhringen with the industrial area “Am Schelmenwasen”. The double-track underground railway tunnel crosses below the industrial area „Fasanenhof”.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings