Technical specifications

Scope of work

  • Length: 5.1 km
  • Excavated cross-section: 80 m² - 95 m²
  • 7 emergency lay-bys
  • 23 cross-passages

Construction method
Sprayed concrete lining (SCL) method
with drill and blast excavation

Geology
Dolomite (dolomia principale)

General data

Project
Roppen Tunnel, Second Tube,
two-lane motorway tunnel and adaptation of first tube

Client
ASFINAG Baumanagement GmbH, Vienna

Contractor
Wayss & Freytag Ingenieurbau AG
in a joint venture

Construction period
2006 to 2010

Construction costs
€ 80 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
5.1 km
Construction Method
Sprayed concrete lining (SCL) method with drill and blast excavation
Related Projects
Klaus Tunnel String 2nd Tubes Lots 4+5
Klaus Tunnel String 2nd Tubes Lots 4+5
Austria

The extension of the Klaus tunnel string with the 2nd tubes on the A9 Pyhrn motorway in Austria means the end of oncoming traffic and thus provides better safety for 18,000 drivers per day.

Read more
Koralm Tunnel KAT 1
Koralm Tunnel KAT 1
Austria

The centrepiece of the 125 km long, double-track high-speed line between Graz and Klagenfurt is simultaneously the key project for the Baltic-Adriatic-Corridor. The Koralm Tunnel improves the traffic link between Graz and Klagenfurt.

Read more
Gleinalm Tunnel 2nd tube
Gleinalm Tunnel 2nd tube
Austria

During extension of the Pyhrn motorway, the Gleinalm Tunnel is provided with a second tube. This makes the motorway safer, since there will be no oncoming traffic in the tunnel.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings