Technical specifications

Scope of work

  • Length: 2.2 km, excavated cross-section: 80 m² - 100 m²
  • 2 parking bays, area: 125 m²
  • 6 cross-passages to an existing exploration tunnel
  • Ventilation shaft, diameter: 4m, depth: 38 m
  • Service buildings and emergency exit shafts

Construction method

  • Drill and blast method in combination with tunnel excavator,
    length: 1.4 km;
  • Cut and cover method: 732 m

Geology

  • Ground moraine
  • Flysch sedimentary rock

General data

Project
B 1 Federal Road Wiener Straße
Henndorf Bypass, two-lane road tunnel

Client
Land Salzburg, Landesbaudirektion
[State of Salzburg, State Building Authority]

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
2006 to 2009

Construction costs
€ 38 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
2.2 km
Construction Method
Drill and blast method in combination with tunnel excavator

Related Projects
Rennsteig Tunnel
Rennsteig Tunnel
Germany

The longest motorway tunnel in Germany is the centrepiece of the new A 71 federal motorway from Erfurt to Schweinfurt.

Read more
Glendoe Recovery Project
Glendoe Recovery Project
Great Britain

Rehabilitation of the head race tunnel with downstream access tunnel and bypass tunnel

Read more
Roppen Tunnel JV
Roppen Tunnel JV
Austria

The Roppen tunnel between Innsbruck and Landeck in Austria was made safer by the construction of the second tube. The 5,069 meter long tunnel was driven conventionally.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings