Technical specifications

Scope of work

  • Double-track mined tunnel
  • Length: 380 m, excavated crosssection: 90 m²;
  • 852 m constructed using the cut and cover method

Construction method

  • Sprayed concrete lining (SCL) method with tunnel excavator
  • Tunnelling under a high rise building
    protected by a pipe umbrella support system,
    under a four-lane federal road and an industrial building with a shallow overburden

Geology
Sandstone of varying strength

General data

Project
U6 metro link to Fasanenhof
double-track tunnel

Client
Stuttgarter Straßenbahnen AG

Contractor
Wayss & Freytag Ingenieurbau AG
as technical leader of a joint venture

Construction period
2007 to 2010

Construction costs
€ 30 million

Utilisation
Infrastructure
Type
Metro tunnel, double-track
Length
2 * 380 m
Construction Method
Sprayed concrete lining (SCL) method with tunnel excavator
Related Projects
Klaus Tunnel String 2nd Tubes Lots 4+5
Klaus Tunnel String 2nd Tubes Lots 4+5
Austria

The extension of the Klaus tunnel string with the 2nd tubes on the A9 Pyhrn motorway in Austria means the end of oncoming traffic and thus provides better safety for 18,000 drivers per day.

Read more
Koralm Tunnel KAT 1
Koralm Tunnel KAT 1
Austria

The centrepiece of the 125 km long, double-track high-speed line between Graz and Klagenfurt is simultaneously the key project for the Baltic-Adriatic-Corridor. The Koralm Tunnel improves the traffic link between Graz and Klagenfurt.

Read more
Silberberg Tunnel
Silberberg Tunnel
Germany

The Silberberg railway tunnel in the Thuringian Forest is part of the new Ebensfeld – Erfurt railway line. The new line connects the old and the new federal states.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings