Technical specifications

Scope of work

  • 2 x 7.9 km
    Standard cross-section: 80 m²
    Emergency lay-bys: 120 m²;
  • 23 cross-passages,
  • 2 central ventilation stations with exhaust shaft
  • 2 air supply adits
  • tunnelling under a 100-year old railway tunnel
    with a small clearance between the tunnels

Construction method

  • Drill and blast method
  • Sprayed concrete lining (SCL) method

Geology

  • Porphyry
  • Conglomerates

 

 

 

General data

Project
Rennsteig Tunnel
twin-tube, two-lane motorway tunnel on the BAB A 71

Client
DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH, Berlin

Contractor
Wayss & Freytag Ingenieurbau AG
as commercial leader of a joint venture

Construction period
1998 - 2003

Construction costs
€ 192 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
2 * 7.9 km
Construction Method
Mining technique protected by a pipe umbrella
Related Projects
Vienna Underground Line – U2/2
Vienna Underground Line – U2/2 "Taborstraße"
Austria

During the construction of the Vienna underground line 2 extensive dewatering works with approx. 270 wells and approx. six million pumping hours were required. An electronic monitoring and control system made the measure safe.

Read more
Light Railway Dortmund “Ostentor”
Light Railway Dortmund “Ostentor”
Germany

New U-railway line in the center of Dortmund will replace the existing overground running tram.

Read more
Stuttgart Underground Line, U6 Fasanenhof
Stuttgart Underground Line, U6 Fasanenhof
Germany

The U6 underground line connects the district of Möhringen with the industrial area “Am Schelmenwasen”. The double-track underground railway tunnel crosses below the industrial area „Fasanenhof”.