Technical specifications

Scope of work

  • 2 x 7.9 km
    Standard cross-section: 80 m²
    Emergency lay-bys: 120 m²;
  • 23 cross-passages,
  • 2 central ventilation stations with exhaust shaft
  • 2 air supply adits
  • tunnelling under a 100-year old railway tunnel
    with a small clearance between the tunnels

Construction method

  • Drill and blast method
  • Sprayed concrete lining (SCL) method

Geology

  • Porphyry
  • Conglomerates

 

 

 

General data

Project
Rennsteig Tunnel
twin-tube, two-lane motorway tunnel on the BAB A 71

Client
DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH, Berlin

Contractor
Wayss & Freytag Ingenieurbau AG
as commercial leader of a joint venture

Construction period
1998 - 2003

Construction costs
€ 192 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
2 * 7.9 km
Construction Method
Mining technique protected by a pipe umbrella
Related Projects
Lilienberg Tunnel
Lilienberg Tunnel
Austria

The double-lane road tunnel is the centrepiece of the Völkermarkt bypass. The town centre is relieved from heavy traffic which in turn means a better quality of life for the population.

Read more
Roppen Tunnel JV
Roppen Tunnel JV
Austria

The Roppen tunnel between Innsbruck and Landeck in Austria was made safer by the construction of the second tube. The 5,069 meter long tunnel was driven conventionally.

Read more
Klaus Tunnel String 2nd Tubes Lots 4+5
Klaus Tunnel String 2nd Tubes Lots 4+5
Austria

The extension of the Klaus tunnel string with the 2nd tubes on the A9 Pyhrn motorway in Austria means the end of oncoming traffic and thus provides better safety for 18,000 drivers per day.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings