Technical specifications

Scope of work

  • 2 x 7.9 km
    Standard cross-section: 80 m²
    Emergency lay-bys: 120 m²;
  • 23 cross-passages,
  • 2 central ventilation stations with exhaust shaft
  • 2 air supply adits
  • tunnelling under a 100-year old railway tunnel
    with a small clearance between the tunnels

Construction method

  • Drill and blast method
  • Sprayed concrete lining (SCL) method

Geology

  • Porphyry
  • Conglomerates

 

 

 

General data

Project
Rennsteig Tunnel
twin-tube, two-lane motorway tunnel on the BAB A 71

Client
DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH, Berlin

Contractor
Wayss & Freytag Ingenieurbau AG
as commercial leader of a joint venture

Construction period
1998 - 2003

Construction costs
€ 192 million

Utilisation
Infrastructure
Type
Road Tunnel, double-track
Length
2 * 7.9 km
Construction Method
Mining technique protected by a pipe umbrella
Related Projects
Vienna Underground Line – U2/2
Vienna Underground Line – U2/2 "Taborstraße"
Austria

During the construction of the Vienna underground line 2 extensive dewatering works with approx. 270 wells and approx. six million pumping hours were required. An electronic monitoring and control system made the measure safe.

Read more
Roppen Tunnel JV
Roppen Tunnel JV
Austria

The Roppen tunnel between Innsbruck and Landeck in Austria was made safer by the construction of the second tube. The 5,069 meter long tunnel was driven conventionally.

Read more
Joint power station at river Inn
Joint power station at river Inn
Austria

The new hydroelectric power plant supplies sustainably produced electricity for approx.100,000 households without emitting pollutants in Tyrol and Engadin. Power house and power descent were built by Wayss & Freytag Ingenieurbau.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings