Technical specifications

Project description

  • Two-lane road tunnel,
    Length 460 m; A= 95 - 120m²
  • Escape and safety tunnels,
    Length = 328 m, A = 13.5 – 18.3 m²

Construction method
Drill and blast

Geology
Upper shell limestone

General data

Project
Darmsheim Northern Bypass
L1182 Darmsheim Tunnel

Client
Federal Land of Baden-Württemberg
represented by RP Stuttgart

Contractor 
Wayss & Freytag Ingenieurbau AG

Construction period
2015 to 2017

Construction costs
€ 13.5 million

Usage
Infrastructure
Type
Road tunnel, two-lane
Length
Length: 460 m
Construction Method
Drill and blast

Related Projects
Rennsteig Tunnel
Rennsteig Tunnel
Germany

The longest motorway tunnel in Germany is the centrepiece of the new A 71 federal motorway from Erfurt to Schweinfurt.

Read more
Glendoe Recovery Project
Glendoe Recovery Project
Great Britain

Rehabilitation of the head race tunnel with downstream access tunnel and bypass tunnel

Read more
Klaus Tunnel String 2nd Tubes Lots 4+5
Klaus Tunnel String 2nd Tubes Lots 4+5
Austria

The extension of the Klaus tunnel string with the 2nd tubes on the A9 Pyhrn motorway in Austria means the end of oncoming traffic and thus provides better safety for 18,000 drivers per day.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings