Technical specifications

Length / Width / Height
17 m / 12 m / 15 m

Structural concrete
1.700 m³

Reinforcement
260 t

Under water concrete
400 m³

Soil excavation, total
3.500 m³

Soil excavation under water
3.000 m³

Sinking depth
15 m

General data

Project
Construction of the new Adlershof Pumping Station

Client
Berliner Wasserbetriebe (Berlin Water Authority)
Neue Jüdenstraße 1, 10179 Berlin

Contractor
Wayss und Freytag Ingenieurbau AG
Straße der Jugend 58, 14974 Ludwigsfelde

Project planning
p2mberlin GmbH
Fasanenstraße 7 - 8,10623 Berlin

Structural engineering
Wayss und Freytag Ingenieurbau AG (execution planning)
Straße der Jugend 58, 14974 Ludwigsfelde

Construction time (shell)
2002 to 2004

Sinking time
2 * 1 week

In connection with the planned development of the science and research centre in Berlin-Adlershof, Wayss & Freytag Ingenieurbau AG built a new wastewater pumping station for Berliner Wasserbetriebe (Berlin Water Authority). It is part of the new wastewater canalisation system in the Eastern part of the city. The structure consists of a lower part, below ground, on which the upper part, the so-called “superstructure” is founded. The lower part is approximately 17 x 12 m and 15 m high. It consists of a sedimentation tank filled with wastewater and a machine room, which is separated from the sedimentation tank by an interior wall on all three basement floors. The machine room extends into the two-storey superstructure up to the roof. The ventilation, common and sanitary rooms are situated above the sedimentation. In the part of the superstructure which overhangs the lower part of the building, there are rooms for the electric power supply as well as the diesel stand-by generator.

Related Projects
Extension Building 66, Daimler AG, Bremen
Extension Building 66, Daimler AG, Bremen
Germany

The simultaneous execution of various construction works in combination with perfect coordination and effective interaction led to a time saving of 1.5 months and accident-free construction. That convinced the client.

Read more
BMW Machine Factory
BMW Machine Factory
Germany

Simultaneous construction works in three building parts, construction method and 3-shift mode made it possible to build the new production facility in a short time.

Read more
Sewerage Pumping Station Berlin-Friedrichshain
Sewerage Pumping Station Berlin-Friedrichshain
Germany

Works clearly within schedule, good quality and cost reduction: convincing facts for the client during the construction of the sewerage pumping station.

Read more

Cookies Policy

Our website uses cookies to improve your experience. Certain cookies can contain personal information. We deactivate Cookies, unless you allow Cooky usage.
Additional information

Allow Cookies
Do not allow cookies
Cookies Settings