Technical specifications

Construction type: Steel-arched bridge or ramp bridge in steel composite constructionBridge category: 60/30 according to DIN 1072Total length of the bridge: 344.00 mArched bridge spans: 66.00 mRamp bridge spans: 24.00/ 29.00/32.00/ 26.50/ 23.50/ 22.50/ 23.00/ 23.00 /23.00/23.00/ 20.50 mOverall height: varying, average 1.53 mSuperstructure bearings: cup and ball bearing

Main quantities:
Concrete: 7,500.00 m3
Reinforcing steel: 1,200.00 t

Constructional steel:
Arched bridge: 800.00 t
Ramp bridges: 475.00 t each

General data

Related Projects
New Bridge Horster Damm
New Bridge Horster Damm
Germany

The bridge was completed 20 months in advance of the agreed deadline as a result of a clever construction concept.

Read more
Ludwig Rehbock Park in Leverkusen
Ludwig Rehbock Park in Leverkusen
Germany

„Himmelsleiter“ (stairway) over the River Wupper connects Leverkusen districts in accordance with the latest safety requirements and provides an improved flood runoff.

Read more
Datzetal (Datze Valley) Crossing
Datzetal (Datze Valley) Crossing
Germany

In the course of Ostseeautobahn BAB A 20 (A20 Baltic Sea Motorway) As part of the traffic project “Deutsche Einheit” (German unity) two bridges on the A 20 motorway form a further link between the old and new federal states.

Read more

WF-IB.de uses cookies to improve user experience and make our website work. By using this site, you agree to the Wayss & Freytag Ingenieurbau AG Cookies Policy

OK